How To Carry Out Commercial EV Charging Stations Installation?

This article will introduce how to install commercial EV charging stations from three aspects: preparation before installation, specific installation steps, and things that need to be done after installation.

commercial EV charging stations

Preparation before commercial EV charging stations installation

1. Obtain construction approval from the government

Before starting the installation process, it is essential to obtain the necessary construction approval from the government. This includes understanding the government’s exemption and subsidy policies related to charging station installations. By doing so, you can take advantage of any incentives or support available.

2. Analyze the environment of the charging station

It is important to carefully analyze the environment where the charging station will be installed. Consult with an electrical contractor to determine the specific location that would be most suitable. Additionally, assess whether any improvements are needed, such as adding lighting equipment, setting up signage, or optimizing the environment to attract customers. Consider the placement of cameras for security purposes as well.

3. Plan for infrastructure construction

Infrastructure planning is a crucial step in the installation process. This includes determining the routing of lines, ensuring access to power sources, pouring concrete for the charging station foundation, trenching if necessary, and landscaping the surrounding area. If required, install routers and other equipment to ensure a reliable network connection. It is also important to determine the number of charging stations to be installed based on demand.

For this, it is advisable to choose an experienced electrical contractor who can handle complex electrical systems and is knowledgeable about local regulations regarding electricity. They can also evaluate your current electrical system to determine if any upgrades are necessary.

4. Determine manufacturer of commercial EV charging stations and network services

Collaborating with network service providers can be highly beneficial in understanding the latest charging technology and optimizing your charging facilities to meet user needs. Regular and active communication with these providers can help you stay updated with emerging trends and improve the operating results of your charging stations.

By following these steps, you can ensure that your commercial EV charging station installation is well-prepared and executed efficiently. This will not only enhance the user experience but also contribute to the growth of electric vehicle adoption and sustainability in your area.

Specific steps for commercial EV charging stations installation

1. Excavate the pit

The first step in installing commercial EV charging stations is to excavate the pit according to the size of the charging pile and the equipment site requirements. This involves carefully digging a hole in the ground to create a space for the charging station’s infrastructure.

2. Install the anchor screws

Once the pit is excavated, the next step is to bury the anchor screws. These screws provide stability and support to the charging station. The length of the screws should be determined based on the characteristics of the underground stratum to ensure proper anchoring.

3. Install the foundation

After the anchor screws are in place, the foundation of the charging pile needs to be installed. This is done by pouring concrete into the pit, which will solidify and create a sturdy base for the charging station.

4. Fixed base

Once the foundation is set, the base of the charging pile can be installed. The base is typically made of durable materials like steel or reinforced concrete. It is securely fixed to the anchor screws using bolts, ensuring that the charging station remains stable and upright.

5. Install the wire

With the foundation and base in place, it’s time to connect the charging station to the power supply. This involves inserting the wire from the power source into the charger. It is important to pay attention to the length and material of the wire to ensure efficient and safe electricity transmission.

6. Install the charger

After the wiring is complete, the charger itself can be installed. Careful consideration should be given to the installation height and location of the charger to ensure convenient access for users and optimal functionality of the charging station.

7. Connect the wires

The final step in the installation process is to connect the wires of the charger. This involves ensuring that all internal wires are properly connected to ensure the stability of the power supply. This step is crucial to ensure that the charging station operates efficiently and reliably.

By following these specific steps, commercial EV charging stations can be successfully installed, providing a convenient and reliable charging solution for electric vehicle owners.

After commercial EV charging station installation

After the commercial EV charging station installation is complete, it is crucial to carry out several important steps to ensure the effectiveness, safety, and compliance of the charging equipment.

1. Carry out equipment testing

Once the charging piles are installed, it is essential to conduct thorough testing of the equipment. This testing should encompass various aspects, such as the power supply, charging power, and the overall charging effect of the device. By examining these factors, any potential issues or malfunctions can be identified and resolved promptly, ensuring that the charging station operates efficiently.

2. Conduct safety testing

The safety performance of the charging equipment is of utmost importance to protect both the users and the station itself. Safety testing should include comprehensive assessments of equipment leakage protection, overcurrent protection, and lightning protection. These tests help verify that the charging station meets all necessary safety standards and regulations, reducing the risk of accidents or damage caused by electrical malfunctions.

3. Conduct acceptance

After the commercial EV charging stations testing and safety assessments are successfully completed, it is essential to carry out acceptance procedures for the charging pile equipment. This process involves evaluating the equipment against relevant standards and specifications to ensure that it meets all requirements and can be utilized safely and effectively. By conducting this acceptance process, you can be confident that your charging station is fully compliant and ready for operation.

Share:

More Posts

Send Us a Message

Consult Your EV Charging Stations Experts

LANGCHI focuses on providing customers with professional charging equipment that is safer, more efficient and more stable.

© 2023 NANJING LANGCHI M&E CO.,LTD.All rights reserved. Privacy Policy

Contact Us Today For A Free Quote

Send Us a Message

We are a leader in endpoint protection solutions by industry analysts, indep endet testing organi- zations and security.